Skip to content
ARE YOU READY?
LET’S PRACTICE!
#1. A reel holds 60 feet of cable. If 2/3 of the cable is used, how many feet are used?
#2. A reel holds 40 feet of cable. If 3/4 of the cable is used, how many feet are used?
#3. A reel holds 55 feet of cable. If 1/5 of the cable is used, how many feet are used?
#4. A reel holds 75 feet of cable. If 4/5 of the cable is used, how many feet are used?
#5. A supply order of $220 is increased by 10%. What is the new total?
#6. A supply order of $180 is increased by 15%. What is the new total?
#7. A supply order of $200 is discounted by 20%. What is the new total?
#8. A supply order of $150 is discounted by 25%. What is the new total?
#9. Solve for x: 4x + 6 = 38
#10. Solve for x: 5x + 9 = 44
#11. Solve for x: 3x − 5 = 22
#12. Solve for x: 6x − 11 = 31
#13. An order includes 24 conduit fittings at $2.5 each and 10 boxes at $4 each. What is the total cost?
#14. An order includes 18 conduit fittings at $3 each and 12 boxes at $5 each. What is the total cost?
#15. A worker buys 5 breakers at $12 each. What is the total cost?
#16. A worker buys 9 receptacles at $7 each. What is the total cost?
#17. A worker buys 15 junction boxes at $4 each. What is the total cost?
#18. A service truck travels at 45 miles per hour for 3 hours. How many miles does it travel?
#19. A service truck travels at 55 miles per hour for 2.5 hours. How many miles does it travel?
#20. A service truck travels at 60 miles per hour for 1.5 hours. How many miles does it travel?
#21. A job site is 90 miles away. If the truck averages 45 mph, how long does the trip take?
#22. A job site is 120 miles away. If the truck averages 60 mph, how long does the trip take?
#23. The current (amps) readings are 11, 9, 10, 12. What is the average current (amps)?
#24. The voltage (volts) readings are 118, 120, 121, 119. What is the average voltage (volts)?
#25. The ratio of apprentices to journeymen is 3:2. If there are 25 workers, how many are apprentices?
#26. The ratio of electricians to helpers is 4:3. If there are 35 workers, how many are electricians?
#27. Find the next number in the sequence: 7, 11, 15, 19, 23, ?
#28. Find the next number in the sequence: 10, 13, 16, 19, ?
#29. Find the next number in the sequence: 6, 11, 16, 21, ?
#30. Evaluate: 8 + 3 × 7 − 4
#31. Evaluate: (5 + 4) × 6 + 2
#32. Evaluate: (7 + 2) × 5 + 3
#33. An electrician installs cable at 20 feet per hour. How many feet can be installed in 3 hours?
#34. Resistors of 4 Ω, 6 Ω, 9 Ω are in series. What is the total resistance?
#35. Resistors of 5 Ω, 8 Ω, 7 Ω are in series. What is the total resistance?
#36. A circuit has 4 A of current through a 18 Ω resistor. What is the voltage across it?
#37. A circuit has 5 A of current through a 16 Ω resistor. What is the voltage across it?
#38. A 48 V source is applied to a 8 Ω load. What is the current?
#39. A 36 V source is applied to a 6 Ω load. What is the current?
#40. A circuit draws 8 A at 96 V. What is the resistance of the circuit?
#41. A total of 24 A is equally divided among 3 parallel branches. How much current flows in each branch?
#42. A total of 18 A is equally divided among 2 parallel branches. How much current flows in each branch?
#43. A total of 30 A is equally divided among 5 parallel branches. How much current flows in each branch?
#44. A safety rule says: ‘Keep combustible materials away from temporary lighting.’ What is the main purpose?
#45. A memo states: ‘Complete a hazard assessment before starting any new task.’ What should workers do?
#46. A job instruction reads: ‘Use only ladders rated for the expected load.’ What must be ensured?
#47. A procedure says: ‘Confirm that circuits are de-energized using an appropriate tester.’ What is required?
#48. A written policy states: ‘All energized work must be documented and approved.’ What must be done before working on live equipment?
#49. A notice reads: ‘Keep fire extinguishers accessible at all times.’ What is expected?
#50. A toolbox talk says: ‘Verify the load rating of scaffolds before use.’ What should workers do?
#51. A safety bulletin states: ‘Report any near-miss incidents immediately.’ What is a worker expected to do?
#52. A job briefing notes: ‘Use lockout/tagout when working inside motor control centers.’ What is required?
#53. A written instruction says: ‘Label new panels with their source and voltage.’ What must be done?
#54. A safety rule states: ‘Use ground-fault protection for receptacles on construction sites.’ What is required?
#55. A checklist item reads: ‘Verify that all covers and guards are replaced after work is completed.’ What should be confirmed?
#56. A panel has breakers rated 15 A, 15 A, 20 A, and 25 A. What is the total of the breaker ratings?
#57. A conduit run is 52 feet long. If 17 feet are removed, how many feet remain?
#58. An apprentice installs 9 fixtures each day for 5 days. How many fixtures are installed in total?
#59. A job requires 56 outlets to be installed evenly on 4 floors. How many outlets go on each floor?
#60. A worker spends 2.25 hours on layout, 3.5 hours on installation, and 1.25 hours on testing. How many hours are worked in total?
#61. Three resistors of 5 Ω, 7 Ω, and 9 Ω are connected in series. What is the total resistance?
#62. A cord reel contains 70 feet of cord. If 29 feet are pulled out, how many feet remain on the reel?
#63. A crew installs 32 lights in one area and 27 in another. How many lights are installed altogether?
#64. A toolbox holds 6 hammers, 8 screwdrivers, and 7 pliers. How many tools are in the toolbox?
#65. A supply house sells 25-foot, 50-foot, and 75-foot reels of wire. If a worker buys one of each, how many feet of wire are purchased?
#66. A ladder is 26 feet long and reaches a point 20 feet above the ground. How many feet of ladder extend beyond that point?
#67. A worker spends 1.5 hours on demolition, 2 hours on rough-in, and 2.5 hours on cleanup. How many hours are worked in total?
#68. A storage area has 4 shelves with 5 bins on each shelf. Each bin holds 12 connectors. How many connectors can be stored in total?
#69. An order includes 3 spools of 100 feet, 2 spools of 75 feet, and 4 spools of 50 feet of cable. How many feet of cable are ordered?