#1. Given specific gravity Gs=2.65, water content w=12%, and void ratio e=0.7, compute degree of saturation Sr=wGs/e.
#2. A circular sewer flows full with D=0.3 m, slope S=0.0025, Manning n=0.015. Estimate capacity Q using Manning equation.
#3. A circular shaft transmits torque T=2000 N·mm. At radius r=40 mm with polar moment J=1000000 mm^4, what is torsional shear stress τ=Tr/J?
#4. A rehabilitation program costs $24000 at year-end for 5 years. At interest rate 8%, what is the present worth?
#5. For earthwork, cross-sectional areas are A1=1449, Am=1734, A2=1923 ft^2 over spacing L=141 ft. What volume by prismoidal formula?
#6. Two coplanar forces act at a point: F1 = 10 N at 43° from +x and F2 = 24 N at 101° from +x. What is resultant magnitude?
#7. Lime stabilization of clayey subgrade is primarily used to achieve which combined effect?
#8. A project requires transforming GNSS latitude/longitude points into local design coordinates tied to a state plane grid. Which sequence is most appropriate?
#9. During flood routing, why is reservoir stage-storage-discharge relationship essential?
#10. A particle starts with speed 13 m/s and constant acceleration 6 m/s^2 over displacement 180 m. Using v^2=v0^2+2as, what is final speed?
#11. For a retaining wall with uniform surcharge q=10 kPa and active coefficient Ka=0.28, what is lateral force from surcharge over height H=7 m (per meter length)?
#12. Lime stabilization of clayey subgrade is primarily used to achieve which combined effect?
#13. A steel member (α=6.0e-06/°F) is 25 ft long and heats by 107°F. What free thermal expansion occurs?
#14. A fully restrained steel member has E=199 GPa, α=1.2e-05 /°C, and temperature rise ΔT=89°C. What thermal stress develops (σ=EαΔT)?
#15. A force with components Fx = -3 lb, Fy = -13 lb is applied at position (x, y)=(4, 3) ft from O. What is scalar moment M_O = xFy – yFx?
#16. Two direction vectors are u=[6, -1, 2] and v=[6, 2, 6]. What is the angle between them in degrees?
#17. A floor framing plan shows beam B3 at grid intersection C-5, while a general note states all beam marks reference the beam schedule for size, camber, and connection type. Which workflow best ensures correct field installation?
#18. Between two points in water system: p1=180 kPa, z1=102.0 m, V1=1.2 m/s; p2=80 kPa, z2=100.0 m, V2=2.0 m/s; headloss=2.5 m. Required pump head?
#19. Three edge vectors of a skewed material cell are a=[0, 3, -3], b=[0, -1, 0], c=[1, 1, 4] (ft). What is the cell volume |a·(b×c)|?
#20. A project allocates overhead to all departments, but one alternative requires dedicated temporary traffic control staff not used otherwise. How should this staff cost be treated in alternative selection?
#21. A mat foundation is often selected over isolated spread footings when:
#22. Using NRCS runoff method: for storm P=3.5 in and curve number CN=85, compute runoff depth Q (in).
#23. A sediment basin excavation covers 8.0 acres to average depth 1.0 ft. A dozer spread has nominal output 1500 yd^3/day with site efficiency 0.85. How many full days are required (ignore weather)?
#24. A PE licensed in one jurisdiction receives a temporary permit in another for emergency flood response. After 24 hours, the PE continues design work outside the temporary permit scope. What is the best compliance interpretation?
#25. A rehabilitation program costs $25000 at year-end for 10 years. At interest rate 8%, what is the present worth?
#26. A rectangular plate 9m×12m has a centered rectangular hole 4m×3m. What is ȳ from the base?
#27. A plane truss has m=30 members, j=17 joints, r=4 reaction components. What is degree of static indeterminacy m+r-2j?
#28. In the four-step travel demand model, where are origin-destination movements between zones estimated?
#29. Between two points in water system: p1=220 kPa, z1=110.0 m, V1=1.2 m/s; p2=60 kPa, z2=100.0 m, V2=2.0 m/s; headloss=3.0 m. Required pump head?
#30. A block of weight 293 lb is on a 15° incline with μs=0.45. What minimum force parallel to plane is required to start moving it up the incline?
#31. Below groundwater table at depth z=4.0 m, with γsat=20.0 kN/m^3, what vertical effective stress increment develops?
#32. Below groundwater table at depth z=4.0 m, with γsat=20.5 kN/m^3, what vertical effective stress increment develops?
#33. For crest vertical curve design with grade change A=6.0%, choose K=48.67 from SSD criteria (given). What curve length L=KA is required?
#34. A mat foundation is often selected over isolated spread footings when:
#35. Same steel column has K=0.7 for frame A and K=1.2 for frame B. What is ratio Pcr,A / Pcr,B?
#36. A simply supported beam with centered load P=24 kip has E=29000 ksi, I=240 in^4, span L=216 in. Compute midspan deflection δ=PL^3/(48EI).
#37. For crest vertical curve design with grade change A=4.0%, choose K=59 from SSD criteria (given). What curve length L=KA is required?
#38. In Hardy Cross analysis of looped distribution systems, what condition must be satisfied at convergence for each loop?
#39. In the four-step travel demand model, where are origin-destination movements between zones estimated?
#40. A bracing panel is spanned by vectors u=[-4, 7, -2] m and v=[5, -1, -2] m. The panel area equals |u x v|. What is that area?
#41. A pump delivers Q=0.12 m^3/s against total dynamic head H=22 m at efficiency η=0.82. What input power is required?
#42. Two direction vectors are u=[7, 1, 1] and v=[5, -3, 4]. What is the angle between them in degrees?
#43. A vertical rectangular gate (width 3.0 m) retains water to depth 1.8 m. What is resultant hydrostatic force on the gate?
#44. In a consolidated undrained triaxial test with pore-pressure measurements, what key advantage exists over unconfined compression?
#45. A steel coupon tested to ASTM tension standards shows yield at 52 ksi and ultimate at 67 ksi. Which interpretation is most accurate for structural design checks?
#46. Using AASHTO-style SN=a1D1+a2m2D2+a3m3D3, with SN=4.0, a1=0.44, D1=5.0 in, a2=0.14, m2=1.1, and ignoring D3, what base thickness D2 is needed?
#47. Which method is commonly used to solve elementary statically indeterminate beams by compatibility and superposition?
#48. A project has three mutually exclusive outcomes: high gain $259000 with probability 30%, moderate gain $108000 with probability 10%, and loss $120000 otherwise. What is expected value?
#49. A simply supported beam span 14 ft carries a uniform load w=6 kip/ft over full span and a point load P=7 kip at 6 ft from A. Find reaction at B.
#50. A simply supported beam span 11 m has full-span UDL w=12 kN/m plus point load P=16 kN at x=7 m from left. What is the maximum positive bending moment (approx., governing critical section)?
#51. Two coplanar forces act at a point: F1 = 11 N at 69° from +x and F2 = 11 N at 156° from +x. What is resultant magnitude?
#52. A bid has direct costs: labor $300,000, equipment $95,000, materials $330,000, subcontracts $120,000. Apply bond 1.5%, overhead 8%, and fee 10% to direct cost. What is total bid?
#53. In a consolidated undrained triaxial test with pore-pressure measurements, what key advantage exists over unconfined compression?
#54. Same steel column has K=1.0 for frame A and K=1.0 for frame B. What is ratio Pcr,A / Pcr,B?
#55. A horizontal curve is represented by x^2 + y^2 + (-4)x + (8)y + (-61) = 0. What is the radius of the circle?
#56. A grading detail indicates slope 1V:8H. If vertical rise is 1.5 m, what horizontal run is required?
#57. For stress state σx=159 MPa, σy=52 MPa, τxy=30 MPa, what is in-plane maximum shear stress τmax (Mohr’s circle)?
#58. A plane truss has m=23 members, j=16 joints, r=5 reaction components. What is degree of static indeterminacy m+r-2j?
#59. A grading detail indicates slope 1V:8H. If vertical rise is 1.0 m, what horizontal run is required?
#60. A dimensionless loading index is modeled by f(x) = 2x^2 + 3/x for x in [3, 7]. Compute I = integral from 3 to 7 of f(x) dx.
#61. Using AASHTO-style SN=a1D1+a2m2D2+a3m3D3, with SN=3.2, a1=0.44, D1=6.0 in, a2=0.14, m2=0.9, and ignoring D3, what base thickness D2 is needed?
#62. A sediment basin excavation covers 6.2 acres to average depth 1.5 ft. A dozer spread has nominal output 1200 yd^3/day with site efficiency 0.75. How many full days are required (ignore weather)?
#63. A block of weight 277 N is on a 15° incline with μs=0.3. What minimum force parallel to plane is required to start moving it up the incline?
#64. For an asphalt mix with binder content 5.2% by total mass, Gsb=2.7, and bulk mix specific gravity Gmb=2.35, estimate air voids Va (%).
#65. A PE licensed in one jurisdiction receives a temporary permit in another for emergency flood response. After 24 hours, the PE continues design work outside the temporary permit scope. What is the best compliance interpretation?
#66. Flow in a reducer has D1=0.5 m, D2=0.2 m, and upstream velocity V1=1.5 m/s. By continuity, what is V2?
#67. Using LRFD combo U=1.2D+1.6L+0.5W with D=79 kip, L=80 kip, W=67 kip, what is factored load U?
#68. Estimate concrete paving cost for area 31500 ft^2, thickness 8 in, waste 10%, and installed unit cost $165/yd^3. What is estimated item cost?
#69. For earthwork, cross-sectional areas are A1=1535, Am=1903, A2=1438 ft^2 over spacing L=63 ft. What volume by prismoidal formula?
#70. A concrete acceptance plan uses compressive tests at 7 and 28 days. Why are both ages useful?
#71. A simply supported beam with centered load P=12 kip has E=29000 ksi, I=180 in^4, span L=264 in. Compute midspan deflection δ=PL^3/(48EI).
#72. Differential leveling run: BM elev=500 ft; BS1=4.83 ft, FS1=6.69 ft, BS2=4.84 ft, FS2=3.03 ft. What is ending elevation?
#73. A simply supported beam with centered load P=24 kip has E=29000 ksi, I=240 in^4, span L=264 in. Compute midspan deflection δ=PL^3/(48EI).
#74. A particle starts with speed 9 ft/s and constant acceleration 6 ft/s^2 over displacement 187 ft. Using v^2=v0^2+2as, what is final speed?
#75. A project has three mutually exclusive outcomes: high gain $204000 with probability 20%, moderate gain $151000 with probability 15%, and loss $130000 otherwise. What is expected value?
#76. For a rectangle b=12 in, h=16 in, find I_x about an axis parallel to centroidal x-axis and offset by d=2 in using parallel-axis theorem.
#77. Flow in a reducer has D1=0.4 m, D2=0.25 m, and upstream velocity V1=1.5 m/s. By continuity, what is V2?
#78. A project requires transforming GNSS latitude/longitude points into local design coordinates tied to a state plane grid. Which sequence is most appropriate?
#79. A 32 kg block slides down a 15° incline with kinetic friction μ=0.15. What is acceleration magnitude along plane (g=9.81 m/s^2)?
#80. A simply supported beam with centered load P=24 kip has E=29000 ksi, I=320 in^4, span L=216 in. Compute midspan deflection δ=PL^3/(48EI).
#81. A signalized intersection has heavy left-turn demand causing spillback. Which control strategy is most direct for reducing opposing-flow conflicts and delay?
#82. A steel tension member has gross area Ag=10.0 in^2 and Fy=65 ksi. If yielding controls with φ=0.9, what is design strength φPn?
#83. A flood-mitigation project provides immediate present-value benefits of $330000. Initial cost is $248000 plus annual O&M of $14000 for 11 years at 6%. What is the benefit-cost ratio?
#84. A simply supported beam span 8 m has full-span UDL w=4 kN/m plus point load P=6 kN at x=5 m from left. What is the maximum positive bending moment (approx., governing critical section)?
#85. A geotechnical alert model flags instability (event B). Prior probability of true instability A is 0.35. Sensitivity P(B|A)=0.8, false-positive rate P(B|not A)=0.1. What is P(A|B)?
#86. For a confined aquifer drawdown screening (Cooper-Jacob style), with pumping Q=700 m^3/day, transmissivity T=650 m^2/day, and dimensionless log term log10(…)=2.903, estimate drawdown coefficient part s=Q/(2πT)*log term.
#87. A signalized intersection has heavy left-turn demand causing spillback. Which control strategy is most direct for reducing opposing-flow conflicts and delay?
#88. Engineer Jordan is asked to certify a retaining wall design prepared by another firm without reviewing calculations. The owner says schedule pressure requires immediate certification. Under professional ethics, what is the most defensible action?
#89. A steel member (α=6.5e-06/°F) is 71 ft long and heats by 77°F. What free thermal expansion occurs?
#90. A force with components Fx = -12 lb, Fy = -5 lb is applied at position (x, y)=(5, 4) ft from O. What is scalar moment M_O = xFy – yFx?
#91. A 42 kg cart increases speed from 3 m/s to 13 m/s on level track. Neglecting losses, what net work is required?
#92. A public owner wants early constructor input during design, guaranteed maximum price later, and single-point coordination of trade packages before 100% design completion. Which delivery approach best fits?
#93. A rehabilitation program costs $23000 at year-end for 10 years. At interest rate 9%, what is the present worth?
#94. Water at 20°C has ν=1.0e-06 m^2/s in a pipe with V=2.0 m/s and D=0.1 m. What Reynolds number Re=VD/ν?
#95. Two direction vectors are u=[5, 1, 5] and v=[7, -2, 7]. What is the angle between them in degrees?
#96. Assume X is normally distributed with mean 36 and standard deviation 10. What is P(21 <= X <= 51)?
#97. Water at 20°C has ν=1.0e-06 m^2/s in a pipe with V=0.8 m/s and D=0.1 m. What Reynolds number Re=VD/ν?
#98. A circular shaft transmits torque T=10000 N·mm. At radius r=20 mm with polar moment J=900000 mm^4, what is torsional shear stress τ=Tr/J?
#99. Which method is commonly used to solve elementary statically indeterminate beams by compatibility and superposition?
#100. In the four-step travel demand model, where are origin-destination movements between zones estimated?
#101. During flood routing, why is reservoir stage-storage-discharge relationship essential?
#102. Coordinates of a triangular lot are (1929,1696), (2078,1696), (2035,1933) ft. What is the area by coordinate method?
#103. Lime stabilization of clayey subgrade is primarily used to achieve which combined effect?
#104. A circular sewer flows full with D=0.6 m, slope S=0.0025, Manning n=0.013. Estimate capacity Q using Manning equation.
#105. A PE licensed in one jurisdiction receives a temporary permit in another for emergency flood response. After 24 hours, the PE continues design work outside the temporary permit scope. What is the best compliance interpretation?
#106. A vertical rectangular gate (width 2.0 m) retains water to depth 1.8 m. What is resultant hydrostatic force on the gate?
#107. A simply supported beam span 20 m has full-span UDL w=12 kN/m plus point load P=19 kN at x=15 m from left. What is the maximum positive bending moment (approx., governing critical section)?
#108. A contract has original value $1,250,000 and approved change orders $165,000. Previous paid progress was 35% of current contract value; this month total earned reaches 62%. With 8% retainage on current earnings, what payment is due this month?
#109. A circular shaft transmits torque T=10000 N·mm. At radius r=13 mm with polar moment J=200000 mm^4, what is torsional shear stress τ=Tr/J?